We were asked to install a resin floor, of 6mm polyurethane resin screed to a new meat productions facility, including a 100mm resin-formed coved upstand.

We were also asked to install 680 linear meters of Resin-formed 100m height coving.

Project Description

Amiri Construction constructed a new Meat Production Facility at Chalcroft Farm.  We installed a polyurethane resin trowel-applied heavy-duty 6mm screed, and 100mm curved coved resin-formed upstand to the entire new facility, including external loading bay areas.  

Despite a challenging working environment, working with & around several other trades, we delivered a top-quality product, on time and to the absolute satisfaction of our client.